    normal patterns sooner. This is particularly important where a convenient detour
    is not available, such as in rural areas, or in regions, such as the Puget Sound,
    where most highways are already operating near or over their intended capacities,
    leaving nowhere for additional traffic to go.
    2.  Reduced Impact on Traffic Flow. Construction methods that allow portions of
    the bridge to be built off-site and then erected quickly on-site can significantly
    reduce the negative impacts of on-site construction. In many cases, prefabricating
    elements allows the on-site work to be completed during night and weekend
    hours, when traffic volumes are lower. This consideration is critical in urban
    areas.
     
    Bridge designs that can be constructed rapidly are particularly useful when a
    bridge is unexpectedly put out of service because of a vehicular collision, earthquake, or
    other disaster. This was illustrated by the I-65 Bridge over I-59 in Birmingham, Alabama
    (Barkley and Strasburg 2002). In 2002, a gasoline tanker collided with one of the piers of
    the I-65 Bridge. The impact and ensuing fire damaged the bridge beyond repair. With
    user costs from the closed bridge estimated at over $100,000 a day, the Alabama
    Department of Transportation implemented a rapid construction solution that replaced the
    bridge in only 53 days (Barkley and Strasburg 2002). Less than three years later, a similar
    accident occurred less than one-half mile from the I-65 bridge, and the replacement
    bridge was designed, fabricated, and constructed in 26 days (Endicott 2005).
    Cast-in-place concrete bridges have been used extensively in Washington State.
    Bridges constructed with cast-in-place concrete substructures, prestressed concrete
    girders, and cast-in-place concrete decks have a good service record in terms of durability
    and seismic performance; however, these bridges require lengthy construction periods.
    Multiple concrete pours are required, and each pour must be allowed to cure before
    construction can proceed. Construction activities associated with cast-in-place concrete, including the construction of falsework, placement of formwork, tying of reinforcing
    steel, and removal of formwork, also increase construction time and must be completed
    on-site where traffic patterns may be disrupted. This project aims to develop alternative
    bridge designs that can be constructed rapidly while preserving the durability and seismic
    performance exhibited by cast-in-place bridges.
    1.2 PRECAST CONCRETE COMPONENTS: A POTENTIAL SOLUTION
     Bridge designs incorporating precast concrete components are a potential solution
    for providing rapid construction. Precast concrete components are reinforced concrete
    members that are fabricated off-site, either in a fabrication plant or staging area, and then
    brought on-site and connected together. The number of on-site construction tasks is
    significantly reduced when precast concrete is used because the building of formwork,
    tying of reinforcing steel, and pouring and curing of concrete for many of the components
    can be completed off-site. Reducing the amount of work that must be done on-site
    reduces traffic disruption, especially because the precast components can usually be
    erected and connected at night. The overall construction time on-site can be reduced by
    using precast concrete components because the components can be fabricated in advance,
    eliminating the time spent waiting for concrete to cure.
     Incorporating precast components into bridge designs can also provide several
    secondary benefits. They include the following:
    •  improved worker safety because the on-site construction time, during which
    workers are potentially exposed to high-speed traffic, is reduced
    •  higher quality members with better durability because of stringent quality control
  1. 上一篇:暖通空调系统英文文献和中文翻译
  2. 下一篇:自然通风英文文献和翻译
  1. 兰州某大酒店空调设计+CAD图纸

  2. 新能源空调系统设计英文文献和中文翻译

  3. 机械设计制造及其自动化英文文献和中文翻译

  4. 会计矿业环境估值方法英文文献和中文翻译

  5. FPGA的全景拼接相机的优化...

  6. 海水淡化的优化设计英文文献和中文翻译

  7. 模拟退火技术来设计英文文献和中文翻译

  8. 中国传统元素在游戏角色...

  9. NFC协议物理层的软件实现+文献综述

  10. 高警觉工作人群的元情绪...

  11. 浅析中国古代宗法制度

  12. C++最短路径算法研究和程序设计

  13. 上市公司股权结构对经营绩效的影响研究

  14. 巴金《激流三部曲》高觉新的悲剧命运

  15. g-C3N4光催化剂的制备和光催化性能研究

  16. 现代简约美式风格在室内家装中的运用

  17. 江苏省某高中学生体质现状的调查研究

  

About

优尔论文网手机版...

主页:http://www.youerw.com

关闭返回