    6.  Assembly Assembly of  the load-bearing structure was started simultaneously on  both sides of  the Ijssel. Span by span the sections of  both main girders were placed and the cross girders in between were welded to  them. To place the first sections, temporary supports were necessary. After welding the bridge  spans,  the  segments of  the  footpath were consecutively assembled and welded together amongst each other and  to the main load-bearing structure. The steel structure on the side of  Hattem was moved by  IOOmm from the abutment to make room for the later following strand  jacking of  the central arch. After reaching the abutment, the arch's parts were mounted onto the two neighbouring spans of  the Ijssel with projections into the river span. Secured from floodwater,  the remaining  135m-long central arch section was mounted onto 2.5m-high temporary supports at a preassembly area at Zwolle. Much attention during design and fabrication was given to the exact  fit between parts to be floated into position and preassembled areas on the  forelands.  In contrast to most of  the common bridges, the mas-sive cross sections with sheet thicknesses of  up to 80mm excluded corrections after strand jacking. After completion, the around 2,40Ot-heavy part to be floated into position was brought onto pontoons by modular transporters over a  ramp erected solely for this purpose;  it was then floated into the bridge's axis and lifted to its final position by strand  jacks.
    摘要:横卧在艾塞尔河的新930m的铁路桥是50km的汉萨线的一个必不可少的一部分,双轨新建线在荷兰兹沃勒和在艾瑟尔湖的莱利斯塔德之间。这座桥获得了设计和构建竞争的设计奖并且是一个有吸引力的桥梁施工建筑的杰出的例子。
    1.介绍
       新的艾瑟尔河大桥是50km长的汉萨线新建铁路线的一部分在荷兰艾瑟尔湖的莱利斯塔德和兹沃勒的内部之间。汉萨线提供了该国北部和西部大都市区如阿姆斯特丹和鹿特丹等地区之间的高效传输连接。双线的施工开始于2007年。它是专为客运和货运设计的并且设计速度为160km/h。论文网
       这个基本工程的东段与西段在艾塞尔河的兹沃勒和哈特姆之间的连接是交叉的。这双轨结构穿过艾塞尔河,它的堤的前岸地区与Gelderse Dijk道路的跨度是33.13 + 4 x 40.0 + 75.0 + 150.0 + 75.0 + 10 x 40.0 + 33.34 = 926.47m.
       在布局上,在哈特姆旁边,艾塞姆上大桥运行一条直线与在兹沃勒旁的桥墩的前面相连形成一条回旋线的半径。这座桥的一个特性是由于每个轨道的转轨器导致上部结构和哈特姆的桥墩可达7.65m的宽度。
       业主,乌特勒支ProRail,,与建设集团的Welling-Züblin 和建筑师奎斯特温特曼、鹿特丹的设计合资公司SSF,慕尼黑的ABT,安海姆建立合作关系一起建造铁路大桥。这座桥的钢结构由阿姆斯特丹的Max Bögl提供。
  1. 上一篇:冲击式破碎机英文文献和中文翻译
  2. 下一篇:暖通空调系统节能英文文献和中文翻译
  1. 汽车内燃机连杆载荷和应...

  2. 机械手系统英文文献和中文翻译

  3. 固体氧化物燃料电池英文文献和中文翻译

  4. 船舶运动仿真系统英文文献和中文翻译

  5. 新能源空调系统设计英文文献和中文翻译

  6. 正交试验回归法和响应曲...

  7. 机械设计制造及其自动化英文文献和中文翻译

  8. 上市公司股权结构对经营绩效的影响研究

  9. NFC协议物理层的软件实现+文献综述

  10. 高警觉工作人群的元情绪...

  11. 浅析中国古代宗法制度

  12. g-C3N4光催化剂的制备和光催化性能研究

  13. 中国传统元素在游戏角色...

  14. 江苏省某高中学生体质现状的调查研究

  15. 现代简约美式风格在室内家装中的运用

  16. C++最短路径算法研究和程序设计

  17. 巴金《激流三部曲》高觉新的悲剧命运

  

About

优尔论文网手机版...

主页:http://www.youerw.com

关闭返回