菜单
  

    Rao, M.P. ‘‘A performance measurement system using a profit-linkedmulti-factormeasurementmodel’’, IndustrialManagement+Data Systems,106(3), pp. 362–379 (2006).[24] Saad, G.H. ‘‘Strategic performance evaluation: descriptive and prescriptiveanalysis’’, Industrial Management + Data Systems, 101(8), pp. 390–399(2001).[25] Kuo, C.H., Dunn, K.D. and Randhawa, S.U. ‘‘A case study assessment of per-formancemeasurement in distribution centers’’, IndustrialManagement+Data Systems, 99(2), pp. 54–63 (1999).[26] Arjomandi, K., Estekanchi, H. and Vafai, A. ‘‘Correlation between structuralperformance levels and damage indexes in steel frames subjected toearthquakes’’, Scientia Iranica, Transactions A: Civil Engineering, 16(2),pp. 147–155 (2009).[27] Mirabi,M., Fatemi Ghomi, S.M.T. and Jolai, F. ‘‘A hybrid electromagnetism-like algorithm for supplier selection in make-to-order planning’’, ScientiaIranica, Transactions E: Industrial Engineering, 17(1), pp. 1–11 (2010).[28] Seyedhoseini, S.M. and Hatefi,M.A. ‘‘Two-pillar riskmanagement (TRPM):a generic project risk management process’’, Scientia Iranica, TransactionsE: Industrial Engineering, 16(2), pp. 138–148 (2009).[29] Jariri, F. and Zegordi, S.H. ‘‘Quality function deployment, value engineer-ing and target costing, an integrated framework in design cost manage-ment: a mathematical programming approach’’, Scientia Iranica, 15(3),pp. 405–411 (2008).[30] Azaron, A. and Modarres, M. ‘‘Project completion time in dynamic PERTnetworks with generating projects’’, Scientia Iranica, 14(1), pp. 56–63(2007).[31] Foster Jr., S.T. ‘‘Towards an understanding of supply chain qualitymanagement’’, Journal of Operations Management, 26, pp. 461–467 (2008).[32] Chin, S., Kim, K. and Kim, Y. ‘‘A process-based quality managementinformation system’’, Automation in Construction, 13, pp. 241–259 (2004).[33] Turk, A.M. ‘‘ISO 9000 in construction: an examination of its application inTurkey’’, Building and Environment, 41(4), pp. 501–511 (2006).[34] Motazed-Keyvani, R., Ghanbari-Parsa, A.R. and Kagaya, S. ‘‘ISO 9000standards: perceptions and experiences in the UK construction industry’’,Construction Management and Economics, 17, pp. 107–119 (1999).[35] Kim, Y.S., Oh, S.W., Cho, Y.K. and Seo, J.W. ‘‘A PDA and wireless web-integrated system for quality inspection and defect management ofapartment housing projects’’, Automation in Construction, 17, pp. 163–179(2008).[36] Tam, V.W.Y. and Le, K.N. ‘‘Quality improvement in construction by using aVandermonde interpolation technique’’, International Journal of Operationsand Production Management, 25, pp. 815–823 (2007).[37] Martinez-Costa, M., Martinez-Lorente, A.R. and Choi, T.Y. ‘‘Simultaneousconsideration of TQM and ISO 9000 on performance and motivation: anempirical study of Spanish companies’’, International Journal of ProductionEconomics, 113, pp. 23–39 (2008).[38] Karamouz, M., Ahmadi, A. and Nazif, S. ‘‘Development of managementschemes in irrigation planning: economic and crop pattern consideration’’,Scientia Iranica, Transactions A: Civil Engineering, 16(6), pp. 457–466 (2009).[39] Mostaghel, R. and Albadvi, A. ‘‘A cross-cultural comparison of service qual-ity prioritization’’, Scientia Iranica,
    Transactions E: Industrial Engineering,16(1), pp. 65–72 (2009).[40] Fok, L.Y., Hartman, S.J., Patti, A.L. and Razek, J.R. ‘‘Human factors affectingthe acceptance of total quality management’’, International Journal ofQuality & Reliability Management, 17(7), pp. 714–729 (2000).[41] Neely, A., Gregory, M. and Platts, K. ‘‘Performance measurement systemdesign—a literature review and research agenda’’, International Journal ofOperations and Production Management, 15(4), pp. 80–116 (1995).[42] Neely, A., Gregory, M. and Platts, K. ‘‘Performance measurement systemdesign—a literature review and research agenda’’, International Journal ofOperations and Production Management, 25(12), pp. 1228–1263 (2005).[43] Phusavat, K., Anussornnitisarn, P., Helo, P. and Dwight, R. ‘‘Performancemeasurement: roles and challenges’’, Industrial Management + DataSystems, 109(5), pp. 646–664 (2009).[44] Phusavat, K. and Photaranon, W. ‘‘Productivity/performance measure-ment, case application at the government pharmaceutical organization’’,Industrial Management + Data Systems, 106(9), pp. 1271–1287 (2006).[45] Kulmala, H.I., Ahoniemi, L. and Nissinen, V. ‘‘Performance throughmeasuring leader’s profiles: an empirical study’’, International Journal ofProduction Economics, 122, pp. 385–394 (2009).[46] Johnston, R. and Pongatichat, P. ‘‘Managing the tension between perfor-mance measurement and strategy: coping strategies’’, International Jour-nal of Operations and Production Management, 28(10), pp. 941–967 (2008).[47] Marchand, M. and Raymond, L. ‘‘Researching performance measurementsystems—an information systems perspective’’, International Journal ofOperations and Production Management, 28(7), pp. 663–686 (2008). [48] Garengo, P. and Bititci, U. ‘‘Towards a contingency approach to perfor-mance measurement: an empirical study in Scottish SMEs’’, InternationalJournal of Operations and Production Management, 27(8), pp. 802–825(2007).[49] Ukko, J., Tenhunen, J. and Rantanen, H. ‘‘Performance measurementimpacts onmanagement and leadership: perspectives ofmanagement andemployees’’, International Journal of Production Economics, 110, pp. 39–51(2007).[50] Bititci, U.S., Mendibil, K., Nudurupati, S., Garengo, P. and Turner, T.‘‘Dynamics of performance measurement and organizational culture’’,International Journal of Operations and Production Management, 26(12),pp. 1325–1350 (2006).[51] Neely, A. ‘‘The evolution of performance measurement research—developments in the last decade and a research agenda for the next’’,International Journal of Operations and Production Management, 25(12),pp. 1264–1277 (2005).[52] Bititci, U.S., Mendibil, K., Martinez, V. and Albores, P. ‘‘Measuring andmanaging performance in extended enterprises’’, International Journal ofOperations and Production Management, 25(4), pp. 333–353 (2005).[53] Evans, J.R. ‘‘An exploratory study of performance measurement systemsand relationships with performance results’’, Journal of OperationsManagement, 22,
  1. 上一篇:施工安全管理因素英文文献和中文翻译
  2. 下一篇:废弃电路板非金属粉作为外加剂在水泥砂浆英文文献和中文翻译
  1. 会计师事务所任期与审计...

  2. 数字通信技术在塑料挤出...

  3. 船舶设计中的消防安全性...

  4. 燃木壁炉对室内空气质量...

  5. 气动系统中的冷凝英文文献和中文翻译

  6. 模具设计中的功能建模英文文献和中文翻译

  7. 注射成型过程中的聚丙烯...

  8. 现代简约美式风格在室内家装中的运用

  9. 江苏省某高中学生体质现状的调查研究

  10. g-C3N4光催化剂的制备和光催化性能研究

  11. NFC协议物理层的软件实现+文献综述

  12. 巴金《激流三部曲》高觉新的悲剧命运

  13. 浅析中国古代宗法制度

  14. 中国传统元素在游戏角色...

  15. C++最短路径算法研究和程序设计

  16. 上市公司股权结构对经营绩效的影响研究

  17. 高警觉工作人群的元情绪...

  

About

优尔论文网手机版...

主页:http://www.youerw.com

关闭返回