菜单
  

    According to the diagram given room number building conditions to determine the load of each room type, room size, window size, envelope heat transfer coefficient, toward the room, the heat transfer area, outdoor weather conditions, and interior design parameters. Excel table to the room with the hourly load of statistics calculated; appear to determine the maximum load and maximum load value of time. According to the design standards of energy conservation, combined with calculation software, cooling coefficient method used throughout the hotel on the hourly cooling load calculations.
    The design requirements based on meteorological data and air conditioning in Shanghai, the business district special room fan coil plus separate rooms using a new air conditioning system, which can meet different functional room staff use the time period of the activities of the different requirements, flexible layout, easy to control. The new spaces are all air system with full fresh air ventilation heat exchange unit, so you do not waste too much energy. Office area and a large hall for staff more space under the load of air-conditioning and air volume is large, easy to set up an  
    independent air system air-conditioning, full air constant air volume system is easy to eliminate noise, filtration and purification and air conditioning zones of temperature and humidity control, and airflow stable, relatively suitable for applications requiring high technology of air conditioning systems.
    In the design the new air intakes the fixed waterproof shutters in order to prevent flood water from entering. According to the actual situation in the office building, offices and corridors use square diffusers, the lobby organization use lateral air flow and select double-outlet louvers. Return air ducts are fixed in the ceiling .The advantages of duct layout is to reduce investment and does not occupy floor space. Moreover, it is easy to decoration and coordination.
    The design elements include: hot and cold air-conditioning load calculation; air-conditioning system and the determination of proof; air supply and air supply parameters of the determination; selection of air-handling equipment; airflow calculated; hydraulic calculation; other equipment of choice; thermal insulation and vibration and noise reduction, and other content. The design for commercial and office buildings of air-conditioning system should be combined the characteristics of itself. The airflow speed, temperature, humidity should reasonable. Staff will feel comfort in this circumstance. This is benefit to get better work efficiency. So take full accounts of reasonable air flow, temperature, humidity and pressure control, energy conservation measures and automatic control system to make the design more reasonable, more in line with national norms, to meet the requirements of owners.
    目录
    绪论.1
    1设计说明.3
    1.1工程概况3
    1.1.1工程简介3
    1.1.2建筑资料3
    1.2设计依据3
    1.3设计参数3
    1.3.1室外设计参数4
    1.3.2室内设计参数4
    2负荷计算.5
    2.1冷、热、湿负荷的概念5
    2.2夏季冷负荷计算5
    2.3冬季热负荷计算8
    2.4湿负荷计算9
    2.5新风负荷计算9
    2.6鸿业软件的负荷计算10
    2.6.1鸿业软件的介绍10
    2.6.2鸿业软件的负荷计算11
    3空调系统的设计方案确定.15
    3.1方案选择原则.15
    3.2空调方式比选16
    3.2.1空调系统的分类16
    3.2.2方案确定19
    3.3空调风系统方案的选择20
    4空调设备的选型.22
    4.1新风加风机盘管的选择.22
    4.1.1风机盘管加新风系统的送风状态.22
    4.1.2风机盘管加新风系统的风量计算.22
    4.1.3风机盘管的选择.23
    4.1.4新风机组的选择.23
    4.2空调箱的选择.25
    4.2.1商业区空调箱的选择.26
    4.2.2办公区及大厅空调箱的选择.26
    5气流组织27
    5.1气流组织介绍27
  1. 上一篇:利丰广场1-3层中央空调系统设计+CAD图纸
  2. 下一篇:上海东观大酒店的空调系统设计+CAD图纸
  1. 宁波市锦江酒店中央空调系统设计+CAD图纸

  2. 福州某综合楼中央空调系统设计+CAD图纸

  3. 上海某商业中心中央空调冷热源设计

  4. 江苏省恒隆大厦混凝土施工方案+CAD图纸

  5. 中央国际广场基坑支护设...

  6. 上海市某商业中心中央空调系统设计+CAD图纸

  7. 宁波市新澳酒店中央空调系统设计+CAD图纸

  8. NFC协议物理层的软件实现+文献综述

  9. 高警觉工作人群的元情绪...

  10. g-C3N4光催化剂的制备和光催化性能研究

  11. 巴金《激流三部曲》高觉新的悲剧命运

  12. 中国传统元素在游戏角色...

  13. 浅析中国古代宗法制度

  14. C++最短路径算法研究和程序设计

  15. 现代简约美式风格在室内家装中的运用

  16. 江苏省某高中学生体质现状的调查研究

  17. 上市公司股权结构对经营绩效的影响研究

  

About

优尔论文网手机版...

主页:http://www.youerw.com

关闭返回