    According to the function of the room, centralized QuanLou supply, adopt fan-coil unit plus fresh air system independently. Wind system, fresh air units from outdoor fresh air into the indoor air enthalpy value, fan coil units to undertake indoor cooling load and part of all new rheumatoid load. Behavior by setting in the corridor ceiling air crew after processing into each room. Fan coil units use the supply side, in view of the model room air volume select tuyere, independent control of each room, meet the actual needs. 

    In the first place in the design of cold and heat load calculation, and then determine the air conditioning system, terminal devices selection, and then to carry on the plane layout, after the hydraulic calculation to determine the pipe and air pipe diameter, complete the floor plan design. In the design of air conditioning system have heat preservation, sound insulation and anti-corrosion design and anti-vibration design, etc. 

    Refuge floor is exclusively for high-rise building fire personnel temporary refuge floors. Fire cut is for firefighters in a certain height (greater than or equal to 100 meters of floor) set up temporary shelter in the room. 

    From the first floor to the first refuge floor high-rise building, the floor should not be more than 15 layer. Fires when gathered around in the 15th floor of seekers, if not the stair evacuation, fire truck available will be bailed out. Some of the current city fire truck, the biggest job height between 30 to 45. In addition, according to the requirements of the layout of all kinds of construction equipment and pipeline, and consider the use and management needs, after the completion of the gap between the refuge floor roughly around 15 layer, in this way, can control a range of evacuation time not too long, but also in the range of good saves from homework, at the same time can be combined with equipment layer. 

    Before the smoke prevention stair well (evacuation) and the room and before the fire elevator room as the main channel of evacuation and rescue, should be a separate partition smoke partitions, and set up independent smoke, the smoke exhaust facility. The safe evacuation, prevent spread of smoke and fire spread and vertical quickly save is very important. 

    Therefore the design of building refuge floor 6 layer, respectively, 22nd floor, 36 layer and 50. When a fire, 1 to 6 layers of staff can be directly through the fire elevator or smoke stair evacuation from the ground, 22 floors, 36 layer and 50 respectively hold its sheltering people between floors. Refuge floor are enclosed refuge storey building, so choose 22 refuge floor level as an example, pressurized air supply calculation and equipment layout. In refuge floor fan for refuge area and 22 to 35 layer of former room, room and before the fire elevator room pressurization design, choose centrifugal blower fan. 

    目录

    1 绪论 1

    1.1空调的节能 1

    1.2建筑消防安全概论 1

    2 设计资料 2

    2.1 工程概况 2

    2.2 气象资料 2

    2.2.1 室内计算条件 2

    2.2.2 室外气象条件 2

    2.2.3 其他冷负荷相关计算条件 3

      2.3 围护结构构造及其热工特性 3

        2.3.2 外墙 3

        2.3.3 内墙 3

        2.3.4 楼板 3

    2.4 工况确定 4

    2.4.1 计算房间的周围环境设置

  1. 上一篇:上海多层厂房建筑结构设计+CAD图纸
  2. 下一篇:海星公司五层办公楼的空调系统设计+CAD图纸
  1. 杭州某饭店空调系统设计+CAD图纸

  2. 南京某医院综合楼空调系统设计+CAD图纸

  3. 镇江某酒店暖通空调系统设计+CAD图纸

  4. 宾馆地源热泵空调系统设计+CAD图纸

  5. 宁波市锦江酒店中央空调系统设计+CAD图纸

  6. 北京市某培训中心空调通风设计课程设计

  7. 上海市某商住两用楼空调通风工程设计

  8. 巴金《激流三部曲》高觉新的悲剧命运

  9. 浅析中国古代宗法制度

  10. 现代简约美式风格在室内家装中的运用

  11. C++最短路径算法研究和程序设计

  12. g-C3N4光催化剂的制备和光催化性能研究

  13. 中国传统元素在游戏角色...

  14. 高警觉工作人群的元情绪...

  15. 江苏省某高中学生体质现状的调查研究

  16. NFC协议物理层的软件实现+文献综述

  17. 上市公司股权结构对经营绩效的影响研究

  

About

优尔论文网手机版...

主页:http://www.youerw.com

关闭返回