Due to the KTV industry began to rise, because it belongs to high places, so most of the KTV will use central air conditioning, then KTV central air conditioning and other places of the central air conditioning is what different?, which mainly and the characteristics of the KTV relationship, through many years of construction experience we return to accept the following points: 1, KTV is entertainment, personnel, mobility, so the cooling load selected standards should be higher than the common places, according to experience at the end of the selection criteria for the 300-400w/m2 host cold load of selection criteria for 150 W / m2. 2, KTV private rooms of varying sizes, space is limited and the suspended ceiling is complex, in order to integrate perfectly with the ceiling, the general use of the top send airflow organization form, not only can raise the ceiling height is in favor of condensed water discharge, inlets in the background on the other side of the wall, air inlet is arranged on the side surface suspended at the top is not easy to be found, can improve the grade and beautiful degrees of room. 3, KTV is a confined space, poor air circulation, in order to improve air quality recommended design, exhaust system, fresh air using fresh air unit input to the indoor fresh air, exhaust the axial flow fan to the indoor dirty air to indoor, to the beautiful ceiling is generally not a single set new air, fresh air inlet is directly connected to the at the air outlet, exhaust separate exhaust outlet, general on the sofa is central, sofa is the central projection can are located on either side. 4, KTV room opened in accordance with the decision of the traffic, so the module air-cooled chiller is more practical, because the module each machine unit 4 sets of scroll compressor, respectively started, compressor according to the room open free start, every unit are independent of the system, and another for repair does not affect the work of other units, throughout the year can be used

   Therefore, KTV design of air conditioning system, choose cold and heat source and arrangement of send, air port, must give full consideration to the KTV own characteristics, reasonable design.

2.Project Overview

  Due to the KTV industry began to rise, because it belongs to high places, so KTV majority will mining this project is located in Ji ning City, Shan dong Province, for a total of three KTV building, which belongs to the  buildings; construction area of 6000 square meters pided three fire partition, each partition has an area of not more than 1000 square meters, have a direct external exit, including building air conditioning design, ventilation design, ventilation design content

3.Design basis

3.1Location

Shanghai Latitude: 35 ° 34 ', Longitude: 116 ° 33', elevation: 37m

3.2Meteorological parameters

1 ) Summer air-conditioning outdoor dry bulb temperature: 29.70 °

    Summer air-conditioning outdoor design wet bulb temperature:27.40℃

    Summer ventilation outdoor dry bulb temperature:30.60°C

    Summer ventilation outdoor calculate the relative humidity: 65 %

    Summer Atmospheric Pressure:999.40  

    Outdoor summer average wind speed:2.4m/s

    Outdoor winter air dry bulb temperature:-7.60 °C

    Outdoor winter air to calculate the relative humidity:66 %

    Winter ventilation outdoor dry bulb temperature:  -1.30 ° C

    Winter Atmospheric pressure: 1020.80  

     Winter outdoor average wind speed: 2.5 m / s

3)Interior design parameters:

Tabel1.2 Interior design parameters

Room Name Summer Winter Fresh air 

上一篇:地质资料分析研究中心建筑与结构设计+CAD图纸
下一篇:企业社会责任信息与消费者购买意愿

浦东中环线高架预应力混...

杨浦区001-07地块养老院设计

上海市杨浦区C4-1地块养老院建筑设计

洛嵩二级公路设计施工图设计+CAD图纸

论企业货币资金内部會计...

南京某建筑公司办公楼建筑及结构设计

南京某中学高中部15班教学楼建筑及结构设计

ASP.net+sqlserver企业设备管理系统设计与开发

LiMn1-xFexPO4正极材料合成及充放电性能研究

张洁小说《无字》中的女性意识

网络语言“XX体”研究

我国风险投资的发展现状问题及对策分析

麦秸秆还田和沼液灌溉对...

新課改下小學语文洧效阅...

老年2型糖尿病患者运动疗...

安康汉江网讯

互联网教育”变革路径研究进展【7972字】