菜单
  

    (4) 防烟系统控制:发生火灾时,由消防中心(或就地手动)打开相应三层(着火层及其上下层)前室的加压风口,凡塔楼着火时,前室与防烟楼梯的加压风机同时联动投入运行;裙房着火时,在发生火灾的防火分区内的加压送风系统全开,并同时投入运行。
    本次设计是校企合作项目,大部分的原始资料,数据,图纸皆由中国海诚工程科技股份有限公司提供。其余设计资料等,是本人参照一些国内外的一些权威著作,发表过的期刊,再结合设计内容,写出的。
    论文包括设计说明和设计计算两部分。说明书应有封面、设计总说明、目录、外文摘要、针对课题就国内外研究现状进行文献综述、必要的计算过程;计算内容应给出其来源;完成数据中心大楼空调系统设计,确定设计方案时应有技术、经济比较说明。设计说明书内容应包括:设计的依据及指导思想;设计方案的系统形式及其优缺点;参数的确定等内容。
    设计图纸应能完整反映出设计概况,图纸一律采用计算机绘图。图纸应包括设计施工说明、主要设备材料明细表、系统图、平面图等。图例及绘图方法执行国家有关制图规范。

    General Information Design
    The task of the subject content
    This air-conditioning systems design is 3M Hefei Phase I(Solar Battery Backsheet/Abrasive Product Project), according to the basic theory and professional knowledge, combined with practical engineering, in accordance with the engineering design specifications, standards, and independently completed the required engineering design. Includes design specifications and design calculations in two parts. Design specification should include: design basis and the guiding ideology; design form and the advantages and disadvantages of the system; Parameters, etc., should determine the design of technical, economic comparison instructions. Design calculations to have the necessary calculations; computing content should be given to its source; finally completed building the data center air conditioning system design. Design drawings should reflect the design of a complete overview of all the drawings using computer graphics. Description should include the design and construction drawings, the main equipment and materials list, the system, plans and so on.Legend and the drawing of the execution of national mapping specification.
    1 Design of the main
    According to the nature of the building, use and construction unit requirements, the South Building, A specific design areas are as follows:
    (1) load calculation: the main room of the hourly cooling load calculations, air conditioning equipment as the basis for calculation and selection.
    (2) the calculation of air-conditioning equipment selection: the selection and calculation, including fan coil units, air conditioning units and air units in the selection of a new calculation. In the selection process to meet the "heating, ventilation and air conditioning design" (GB50019-2003) requirements; in the selection process should be based on the use of the building, size, use the characteristics of an investment as far as possible the conditions Province, the system runs the principles of economy and reduce energy consumption.
    (3) air conditioning duct systems design: choose according to the actual situation of the building's air system;
    (4) air-conditioning water system hydraulic calculation and wind systems: the water system and water system, including the most unfavorable pipeline design, fan coil units and air conditioning layout. This is the air conditioning system design, a very important step.
    (5) the use of CAD drawing software will bear Marine Garden Tower, Shanghai to conduct a complete and comprehensive air-conditioning system design, and meet graduation requirements.
    2 Design of the main content
    2.1. Air conditioning system design
  1. 上一篇:四星级酒店中央空调系统设计+CAD图纸
  2. 下一篇:商业办公楼建筑与结构设计+现浇钢筋混凝土框架+CAD图纸
  1. 杭州某饭店空调系统设计+CAD图纸

  2. 6层科大办公楼框架结构设计+CAD图纸

  3. 四层会议培训中心办公楼...

  4. 南京某医院综合楼空调系统设计+CAD图纸

  5. 镇江某酒店暖通空调系统设计+CAD图纸

  6. 长江办公楼工程量清单及招标控制价编制

  7. 宾馆地源热泵空调系统设计+CAD图纸

  8. g-C3N4光催化剂的制备和光催化性能研究

  9. 现代简约美式风格在室内家装中的运用

  10. C++最短路径算法研究和程序设计

  11. 中国传统元素在游戏角色...

  12. 高警觉工作人群的元情绪...

  13. 江苏省某高中学生体质现状的调查研究

  14. 浅析中国古代宗法制度

  15. 上市公司股权结构对经营绩效的影响研究

  16. 巴金《激流三部曲》高觉新的悲剧命运

  17. NFC协议物理层的软件实现+文献综述

  

About

优尔论文网手机版...

主页:http://www.youerw.com

关闭返回