摘要本设计根据某地区电网分布和负荷条件等情况,设计了该地区一种可行的电网规划方案。首先,本设计通过参照有关国家设计规程,选择了发电机、变压器的型号。然后,通过对地区电网分布的功率计算、潮流计算、导线成本和运行成本计算,选择了一种较为经济的电网布局。本设计在基本电网布局的基础上,对电网中110kv、35kv、10kv母线短路情况分别进行了计算,并依此为根据选择了符合国家规范的有关一次设备和继电保护装置。67342
毕业论文关键词 电网规划 潮流计算 短路计算 继电保护
毕业设计说明书(论文)外文摘要
Title design of grid planning and electrical part of the power plant for one region
Abstract
According to a regional power distribution and load conditions, the region as a viable network planning scheme is given in this design.First, by reference to the relevant national design rules, I chose the generator, transformer models.Then, through the regional power distribution grid computing, flow calculation, the wire cost and operating cost, I chose a more economical grid layout.The grid 110kv, 35kv, 10kv busbar short-circuit calculations were carried out on the basis of this,and I select the relevant equipment and protection devices at the same time.
Keywords Network Planning Flow calculation Short-circuit calculation Relay protection
目 录
1 引言 2
1.1 电力系统概述 2
1.2 毕业设计的条件、要求和目标 2
1.2.1 电源情况 2
1.2.2 负荷情况 2
1.2.3 气象数据 2
1.2.4 地理位置数据 3
1.2.5 任务目标 3
2 电厂发电机和变压器的选择 4
2.1 确定发电机型号、参数 4
2.2 确定变压器型号、参数 4
2.2.1火电厂主变压器容量的选择 4
2.2.2水电厂主变压器容量的选择 5
3 新建火电厂及其电气主接线的确定 6
3.1 电气主接线的设计要求 6
3.2 电气主接线的设计和确定 6
4 短路电流的有关计算 23
5 火电厂一次装备的选择 28
5.1选择电气一次设备遵循的条件 28
5.1.1按正常工作条件选择 28
5.1.2按短路条件进行校验 29
5.2断路器和隔离开关的选择 30
5.2.1 110kV断路器和隔离开关的选择 30
5.2.2 35kV断路器和隔离开关的选择 31
5.2.3 10kV断路器和隔离开关的选择 31
5.3电压互感器的选择 32
5.4电流互感器的选择