out[1]j hsup
hout jð2Þwhere subscript ‘‘sup” indicates the supply air conditions, and ‘‘out”the outdoor air conditions; ‘‘sen” and ‘‘lat” indicate sensible and la-tent load, respectivelyThe COP of the whole system, including transmission losses andefficiency of power generating plants, is calculated as follows:COPtotal ¼Ptimeðj Q[1]sys jÞPtimeE[1]power;plantð3ÞThe primary energy demand for the generation of electricity, whichsatisfies the on-site energy demand by the VAV system and trans-mission losses, is estimated as follows:E[1]power;plant ¼ E[1]totalgtrans[1]a1ghydroþ a2gnuclþ a3goilþ a4ggas !ð4Þwhere gtrans = 0.94 [12] is the efficiency of power transmission; thecontribution of different primary energy sources in power genera-tion plants in Quebec is the following: a1 = 0.954 for hydro power,a2 = 0.02 for nuclear, a3 = 0.001 for natural gas, a4 = 0.021 for hea-vy fuel oil [13]; the contribution of diesel fuel oil and light fuel oil(0.001) and wood (0.003) is neglected. The following assumptionsare used in the analysis: the overall energy efficiency of a naturalgas-fired power plant is 43.1% [14], of an oil-fired power plant is33% [15], of a nuclear power plant is 30% [16], and of a hydro-powerplant is 80% [17]. In this paper, the annual average electricity mix inQuebec is used to calculate the electricity use from different powergeneration plants, instead of using the hourly electricity mix be-cause of lack of data. The calculation of electric demand of a fewcomponents is presented, as example, in the following sections.3.2. Hot water boilerAt part-load conditions, the electric input to the boiler is calcu-lated as follows [10]: 3.6. BoilerThe exergy efficiency of the boiler is calculated as follows:gII;boil
- 上一篇:进销存管理系统英文文献和中文翻译
- 下一篇:Tebuthiuron对水产品生产力的影响英文文献和中文翻译
-
-
-
-
-
-
-
浅析中国古代宗法制度
中国传统元素在游戏角色...
C++最短路径算法研究和程序设计
NFC协议物理层的软件实现+文献综述
现代简约美式风格在室内家装中的运用
g-C3N4光催化剂的制备和光催化性能研究
高警觉工作人群的元情绪...
江苏省某高中学生体质现状的调查研究
巴金《激流三部曲》高觉新的悲剧命运
上市公司股权结构对经营绩效的影响研究