[12] ALAVI I, AKBARI A, ALINEJAD-ROKNY H。 Plant type selection for reclamation of Sarcheshmeh Copper Mine by fuzzy-TOPSIS method [J]。 Advanced Engineering Technology and Application, 2012, 1(1): 8−13。
[13] SAFARI M, KAKAEI R, ATAEI M, KARAMOOZIAN, M。 Using fuzzy TOPSIS method for mineral processing plant site selection, Case study: Sangan Iron Ore Mine (phase 2) [J]。 Arabian Journal of Geoscience, 2012, 5: 1011−1019。
[14] SHARIATI S, YAZDANI-CHAMZINI A, POURGHAFFARI BASHARI B。 Mining method selection by using an integrated model
[J]。 International Research Journal of Applied and Basic Sciences, 2013, 6(2): 199−214。
[15] CHEN C T。 Extensions of the TOPSIS for group decision making under fuzzy environment [J]。 Fuzzy Sets and Systems, 2000, 114(1): 1−9。 [16] SAGHAFIAN S, HEJAZI A R。 Multi-criteria group decision making using a modified fuzzy TOPSIS procedure [C]// International Conference on Computational Intelligence for Modeling, Control and Automation and Conference Intelligent Agents, Web Technologies and Internet Commerce IEEE, Vienna, 2005: 215−221。
[17] ZADEH L A。 The concept of a linguistic variable and its application to approximate reasoning [J]。 Information Sciences, 1975, 8: 199−249 (I), 301−357 (II)。
[18] DENG H。 Multi criteria analysis with fuzzy pair-wise comparison [J]。 International Journal of Approximate Reasoning, 1999, 21(3): 215−231。
[19] ERTUĞRUL İ, KARAKAŞOĞLU N。 Fuzzy TOPSIS method for academic member selection in engineering faculty [J]。 M。 Iskander (ed。), Innovations in E-learning, Instruction Technology, Assessment, and Engineering Education, 2007: 151−156。
[20] ROUHANI A K, HOJAT A。 Determination of groundwater and geological factors using geoelectrical methods to design a suitable drainage system in Gol–e–Gohar iron ore Mine [C]// Iran, International Mine Water Association Symposium, England, 2004: 219−224。
[21] BITARAFAN M R, ATAEI M。 Mining method selection by multiple criteria decision making tools [J]。 The Journal of the South African Institute of Mining and Metallurgy, 2004, 104(9): 493−498。
[22] NAMIN F S, SHAHRIAR K, KARIMI NASAB S。 Mining method selection in third anomaly of Gol-E-Gohar iron ore deposit [C]// International Mining Congress and Exhibition of Turkey-IMCET Turkey, 2003: 29−34。
[23] UTLEY R W。 Selection and sizing of primary crusher。 Mineral Processing Plant Design, Practice, and Control [M]。 Published by the SME, 2002。
[24] KWON J, CHO H, MUN M, KIM K。 Modeling of coal breakage in a double-roll crusher considering the reagglomeration phenomena [J]。 Powder Technology, 2012, 232: 113−123。
摘要:选择破碎机需要大量的关于矿山规划的设计。选择合适的初级来自所有可用的主破碎机的破碎机是多标准决策(MCDM)问题。现在的工作探索