菜单
  

    四、设计依据
    1. 采暖通风与空气调节设计规范(GBJ 19-87-2001)
    2. 民用建筑暖通空调设计技术措施(第二版)
    3.《暖通空调制图标准》(GB/T 50114-2001)
    4. 民用建筑防排烟技术规范(DGJ 08-88-2000)
    五、参数                                
                              上海室外气象参数
    季节            干球温度           湿球温度        相对湿度
    夏季            34.6℃              28.2℃           69%
    冬季            -1.2℃               ―              74%
                                上海室内参数
    夏季温度        26℃               相对湿度          50%
    冬季温度        18℃               相对湿度          18%
    General description of the design
    A, project overview
        Shanghai Port International Hotel D district (District Office), located in Shanghai City, a total construction area of 5528.76m2, a total of four. Building height of 17.1 meters, one to three layers for the office, including the manager's office, office, financial room, large conference room, auditorium, room etc.. Floors are 4.2 meters; the fourth layer is the engine room equipment rooms, floors to 4.5 meters, with tanks, cooling towers, chillers, boilers, etc..
    Two, system design
    1. load calculation
    1) The building of four floors, including top-level room. 1-3 layer of 4.2 meters high; the 4 layer of 4.5 meters high. Outside the window height is 1.8 meters, air-conditioning the use of an area of 2496.57㎡.
    2) The need for air conditioning area: general manager's office, office, office, lobby manager, financial room, large conference room, auditorium.
    3) Fresh air volume according to personnel density, 30m ³ /h.
    4) Office personnel density 0.18 / ㎡.
    5) The room lighting power: office, general manager office, financial room, large conference room 18W/ square meters. Office, room 11W/ ㎡.
    6) Room equipment power: office, general manager office, financial room, large conference room 13W/ square meters. 20W/ square meters of office. The 5W/㎡.
    7) Maintain the value structure of the heat transfer coefficient:
    ①The external use of concrete 26-175 type external wall, heat transfer coefficient is 0.97K (w/ ㎡.℃).
    ②The window with double-layer alloy hollow glass window, heat transfer coefficient is 3.31K (w/ ㎡.℃).
    ③The outer door double-layer metal door, filled with 15 ~ 18 thick mineral wool board, the heat transfer coefficient of 3.15K (w/ m.℃).
    ④The inner door metal door, filled with 15 ~ 18 thick mineral wool board, the heat transfer coefficient of 3.15K (w/ ㎡.℃).
    ⑤The use of prefabricated 01-1-35-1 roof, heat transfer coefficient is 1.26K (w/ ㎡.℃).
  1. 上一篇:十二层公司办公楼中央空调系统设计+CAD图纸
  2. 下一篇:国际酒店暖通空调系统设计+CAD图纸+计算书
  1. 镇江某酒店暖通空调系统设计+CAD图纸

  2. 宁波市锦江酒店中央空调系统设计+CAD图纸

  3. 台州香格里拉酒店暖通空调工程设计

  4. 成都某酒店空调系统设计+CAD图纸

  5. 上海某连锁酒店空调系统设计+图纸

  6. 宁波某国际大酒店空调工程设计

  7. 南京市某公寓式酒店暖通空调课程设计

  8. NFC协议物理层的软件实现+文献综述

  9. 中国传统元素在游戏角色...

  10. 巴金《激流三部曲》高觉新的悲剧命运

  11. C++最短路径算法研究和程序设计

  12. 上市公司股权结构对经营绩效的影响研究

  13. 浅析中国古代宗法制度

  14. 江苏省某高中学生体质现状的调查研究

  15. 高警觉工作人群的元情绪...

  16. 现代简约美式风格在室内家装中的运用

  17. g-C3N4光催化剂的制备和光催化性能研究

  

About

优尔论文网手机版...

主页:http://www.youerw.com

关闭返回