    and  set the security  evacuation signs. The safe evacuation  distance of most negative point is
    21.8m.
    Evacuation staircase used scissors stairs, set the pressurized air supply system.
    A share room is available. First floor is equipped with 3 safety exits to outdoor straightly,
    the rest of the layers of safety exits number 2, comply with the requirements of the specification.
    All public evacuation doors open to evacuation direction. At the top of the safe exit set safety
    exit sign, the evacuation corridor and corner from the ground 1.00m on the wall of the
    evacuation aisle marketed with the symbol. The building is equipped with stairs stairwells and
    fire elevator. The front room’s door adopt B fire door, and open to the evacuation direction. The
    distance are not exceed 30m, from the fire elevator room to direct outdoor outlet.
    Fire hydrant system design: the water consumption of outdoor fire hydrant water supply
    system is 15L/s, supplied by the municipal pipe network, is not stored in the fire pool. Around
    the buildings and along the road lay out 2 outdoor fire hydrants.
    The indoor fire water supply system is separated from life, production water supply system
    independent setting, and the water supply pipeline layout into a ring. The introduction tube of
    Indoor fire water pipe network and regional annular pressure or high-pressure water supply
    system set to 2. Fire hydrant water is designed to 20L/s. By calculation, fire hydrant layout
    spacing of 28.1 m, and set 3 fire standpipe. At the time,to layout three fire hydrant On each
    floor of each building . In the position of the elevation of 74.2m to set roof water tank, the fire
    water tank of the working volume of 26.47 m3
    , and set the pressure facilities. Equipped with a
    fire pool, the effective volume of 250m3
    .The two buildings only need to set up a fire pool.
    Indoor fire hydrant water supply pipeline flow rate of 44.123 L/s, the total pressure is
    0.99765MPa. Selection of fire pump models for XBD-SBL, one with a case, and Capacity to 45
    L/s, rotating speed of 3000 r/min, the shaft power 0f 32.3kw.   
    Fire extinguisher configuration design: A high-rise office building, the risk level for design
    objects is less dangerous level. The main fire type is a class fire and solid E class fire.  In the
    design process, each floor will be pided into independent cell, and protection area is 424.67m2
    .
    The calculation of the unit demanded with minimum fire rating according to the calculation of
    unit area, each calculation unit minimum need fire control level for 4A. Choosing portable fire
    extinguisher, its maximum protection distance is 20 m. Sure fire extinguisher the set point for
    the three, each fire extinguisher setting minimum required level of fire for 3 a. By protective
    circle simplify the design method to determine the fire extinguisher set the point, every floor is
    equipped with 3 set points.
    The type of fire extinguishers  for MF/ABC5 fire extinguisher,  each set point matching
    with 2 MF/ABC5 portable fire extinguishers and use the wall embedded fire extinguisher box.
    Mechanical pressure air supply systems design: mechanical pressure air supply system
    must be set up in the smoke prevention stair well. Stair case pressurization air outlet layout in
    every two or three layers while the antechamber is provided with 1.
    The design of air flow is 19861m3
    /h, the design of wind speed is 6m/s. The tuyere area
    tuyere area is 0.5 m2
    , select the 850mm × 600mm since the vertical type louver, tuyere area of
    0.5 m2
    . Then, select 850 mm x 600 mm since the vertical type shutter tuyeres.
     
    Key words: high-rise buildings; hire safety status; fire hydrant; fire extinguisher;pressurized
    air supply
  1. 上一篇:公寓项目建设成本控制技术研究
  2. 下一篇:混凝土简支梁按施工工艺设计+图纸
  1. 旧城改造存在的问题及对策研究

  2. 江科大实验楼BIM综合运用...

  3. 高层商务综合楼的建筑设计

  4. 人民是国家安全的什么和管理者

  5. 五层青年旅社的框架建筑结构设计+图纸

  6. 大学实验楼BIM综合运用基于BIM的技术标的编制

  7. BIM的综合楼工程商务标编制+CAD图纸

  8. 浅析中国古代宗法制度

  9. 中国传统元素在游戏角色...

  10. 现代简约美式风格在室内家装中的运用

  11. C++最短路径算法研究和程序设计

  12. g-C3N4光催化剂的制备和光催化性能研究

  13. 上市公司股权结构对经营绩效的影响研究

  14. 巴金《激流三部曲》高觉新的悲剧命运

  15. 江苏省某高中学生体质现状的调查研究

  16. 高警觉工作人群的元情绪...

  17. NFC协议物理层的软件实现+文献综述

  

About

优尔论文网手机版...

主页:http://www.youerw.com

关闭返回