    关键词:安全评价;模糊综合评价;危险有害因素;重大危险源
    Study on risk assessment and Countermeasures in a new project
    Abstract:The theory of safety evaluation has been established since the 1950s. People came to know its important role to improve the level of safety management of enterprise, reduce the number of accidents and promote the healthy development of the enterprise. In this paper, in combination with the present situation of chemical production safety in China, make a safety assessment on a new project.  
    This paper enumerates accidents happened in recent years in the chemical industry, according to the accident analysis the cause of the accident and the lesson from this accident. Through searching the literature, I learned the development of domestic and international safety evaluation, present situation and application of the fuzzy comprehensive evaluation method development. This paper summarizes the basic situation of the enterprise, including the project situation, main equipments, storage tank and raw materials etc.. Further understand and grasp the enterprise production process, the main products, equipments, safety evaluation, as to do the groundwork for safety evaluation.
    According to the "casualty workers classification" (GB6441-1986) 20 categories mentioned, for the new projects carried out a comprehensive hazardous, harmful factors identification. The identification of the dangerous harmful material, the project involves a material with nitrogen, HFC-125, HFC-32, R-410A, no dangerous chemical products, intermediate products and by-products. In addition, one of the important project of major hazard identification and safety evaluation, according to the "identification of major hazard of dangerous chemicals" (GB18218-2009) for the identification of dangerous source, the result is still controllable range. The pision of evaluation unit is designed to facilitate the evaluation work, improve the accuracy of evaluation and comprehensive. The evaluation unit is pided into 6 parts for safety assessment. Are: the overall layout and the conventional protection facilities evaluation; evaluation of special equipment inspection records; electrical safety evaluation; evaluation of the safety production management measures; evaluation unit safety inflammable and explosive places; safety evaluation of tank places.
    Qualitative safety assessment method is mainly based on experience and intuition to judge the ability of production system technology, equipment, facilities, environment, personnel and management of the status of qualitative analysis, the evaluation results is some qualitative indexes. Quantitative safety assessment method is the use of a large number of experimental results and extensive accident data statistical analy sis of the obtained indexes or based on rules, quantitative calculation of production system technology, equipment, facilities, environment, personnel and management situation, the evaluation result is of some quantitative indicators. On the evaluation of enterprise equipment, electrical, fire facilities, construction, safety management and process operation is dangerous, harmful factors identification and analysis.
    This paper finally selected for evaluation the issuance of fuzzy comprehensive evaluation, the comprehensive evaluation method based on the membership degree of fuzzy mathematics and the theory of the qualitative evaluation into quantitative evaluation, it is a kind of comprehensive evaluation method in fuzzy mathematics based on, to be affected by multiple factors, according to a certain criterion, gives the possibility of obtaining a thing comment. It has the characteristics of strong, system results in a clear, can better solve the fuzzy, difficult to quantify the problem solving, suitable for all kinds of uncertain problems. For the determination of weights using the analytic hierarchy process method, generally have to go through the following five steps using the analytic hierarchy process: establish the hierarchical structure model; constructing judgment matrix; order in single level; consistency test; the level of total order.
  1. 上一篇:社会工作理念在企业成长中的应用研究
  2. 下一篇:美的制冷家电集团的营销渠道分析
  1. 公益众筹项目成功影响因素的实证研究

  2. 商品住宅开发项目定位问题研究+SWOT分析

  3. 互联网+背景下影响大学生...

  4. 互联网+背景下导致大学生...

  5. 工程建设项目中的进度管理

  6. 商品住宅开发项目定价策略探讨

  7. 商品住宅开发项目风险管理研究

  8. 江苏省某高中学生体质现状的调查研究

  9. 现代简约美式风格在室内家装中的运用

  10. 高警觉工作人群的元情绪...

  11. 浅析中国古代宗法制度

  12. 中国传统元素在游戏角色...

  13. C++最短路径算法研究和程序设计

  14. 巴金《激流三部曲》高觉新的悲剧命运

  15. g-C3N4光催化剂的制备和光催化性能研究

  16. NFC协议物理层的软件实现+文献综述

  17. 上市公司股权结构对经营绩效的影响研究

  

About

优尔论文网手机版...

主页:http://www.youerw.com

关闭返回