    本论文主要关注H85、H65黄铜板带钢的生产技术要求及其关键生产工序(熔炼、铸造、铣面、轧制、退火等)的工艺特点。根据中铝上海铜业有限公司现有的生产流程以及产品,进行对产品生产熔炼工艺的制订、轧制制度编制、辊型制度制定、电机能力校核、轧辊强度校核,在设计过程中利用电脑软件Visual Basic编程语言,对轧制力及轧制力矩进行计算程序的编制,利用电脑软件Auto CAD,对轧辊图进行绘制。从而设计出符合实际生产标准的产品及其生产流程。利用电脑软件Auto CAD绘制出自己所设计产品的厂房设计图纸。9827
    关键词: H85黄铜;H65黄铜;工艺车间设计;Visual Basic;Auto CAD
    Annual output of 2.2million tons of brass belt production process design with brass band
    Abstract: In recent years, with the sustained and stable development of China's national economy,the production of copper material also entered a period of rapid development, production reached 3.196 million tons in 2008, of which about 60 million tons of copper plate and strip, becoming the first a large copper-producing country over the world. China's copper strip production capacity and production has dramatically increased, but the copper to lower the overall level of enterprise technology and equipment, small-scale production, the average firm size is less than 3000 tons / year, copper strip varieties The structure is becoming an unreasonable phenomenon, especially the lead frame material, RF cable transformer, Copper belt and other high-precision copper products, whether the variety, quality and quantity are far from plate and strip imports amounted to 237,000 tons. It is predicted that the future demand for brass will rise year by year, according to the current domestic production capacity, production has far cannot satisfy the market demand. Due to brass plate strip rolling, many scholars who come from china or abroad and engineers have formulated the process research in the rolling method, grasped the defect causes, mechanisms, put forward a number of improvement measures, and achieved good effect.Which can increase production, increase yield, making the copper strip further development.
    My topic is annual output of 2.2million tons of brass belt production process design with brass band. Conditions of existing equipment from China Shanghai Copper Co., Ltd., I complete the process design through a variety of system and achieved the desires of production . The factory equip melting furnace of copper ,which capacity is 5-8 tons ,with being chosen 5 ton as my output coming from one furnace . According to the thickness and width of production by calculating , removal amount of trimming , trimming allowance is decided . In the end, I can calculate the length of two products after casting . Made boiler H85 coil as well as for air conditioning needed for the cooling of the condenser tube , and indicators on the mechanical properties of the product demand is high, the market demand is bigger . H65 as hardware, springs and machine parts in everyday life, the market demand is stable and yields higher required to meet the social production. This design of copper alloy plate strip production process: by copper melting furnace heating with water after adjusting for holding furnace heat preservation and the analysis of the components into the semi-continuous casting machine casting, cast ingot billet, after milling surface to remove surface oxide layer to enter before stepping in front of the furnace for hot rolling mill for heat treatment, its purpose is to eliminate casting stress, ensure high temperatures of hot rolling plasticity, reduce the deformation resistance and improve the organization and performance of alloys. Out of step furnace directly into hot rolling stage, after the raw material mill into cold rolled thickness requirements, carries on the milling surface coiling. Entered the stage of cold rolling method rolling belt type, i.e., open book into the cold rolling mill, with q can be processed by the product reaches its maximum rate under pressure after coiling, the use of bell type annealing furnace for annealing. Refund after the fire products are under normal pressure to enter a mill after further down, until the rate of maximum pressure again. If has not meet the requirements of thickness, annealing; If has reached a thickness requirement, can the mill coiling, you need to complete the finished heat treatment, using air cushion type annealing furnace. When, after the completion of the whole annealing for final shear straightening, product quality inspection, confirm the product conform to the requirements of the delivery of the goods is packing into the Treasury, waiting for the delivery of the goods.
  1. 上一篇:相转移催化合成丁基丙二酸二乙酯
  2. 下一篇:腐植酸在磷化中的应用及其机理的研究
  1. 年产20万吨乙二醇中浮阀精馏塔的设计

  2. 年产20万吨乙二醇换热器设计

  3. 年产20万吨乙二醇工艺设计

  4. 年产2.4万吨甲醇-水混合液...

  5. 年产20万吨乙二醇反应器设计

  6. 年产10万吨乙二醇工艺设计

  7. 年产20万吨煤制甲醇生产工艺初步设计

  8. 上市公司股权结构对经营绩效的影响研究

  9. 现代简约美式风格在室内家装中的运用

  10. C++最短路径算法研究和程序设计

  11. g-C3N4光催化剂的制备和光催化性能研究

  12. NFC协议物理层的软件实现+文献综述

  13. 浅析中国古代宗法制度

  14. 中国传统元素在游戏角色...

  15. 江苏省某高中学生体质现状的调查研究

  16. 巴金《激流三部曲》高觉新的悲剧命运

  17. 高警觉工作人群的元情绪...

  

About

优尔论文网手机版...

主页:http://www.youerw.com

关闭返回